![]() |
|||||
![]() |
The coal crusher building has four parts. First the concrete pillars with between the pillars funnels that come from the floor above to transport the crushed coal out. The first floor that is above the pillars contains the machinery to crush the coals. On top of that are the coal-bunkers. The top floor had a conveyer to load the bunkers with coal. |